Aker Awarded BP Norge Tie-Back Contract For Ula

BP Norge has awarded Aker Solutions an engineering, procurement, construction and installation (EPCI) contract for a tie-back from Oselvar to the Ula platform. The scope of work includes engineering, procurement, fabrication of module and other minor components, installation offshore and commissioning assistance. The execution phase is based on a front-end engineering design study performed by Aker Solutions.

The object of the tie-back operation is to transport oil and gas 24km from the Dong-operated Oselvar field to BP's Ula platform for processing. The oil will be processed at the platform. The gas will either be re-injected or exported via pipeline to Gyda and Ekofisk facilities. Work under the contract starts immediately and the project will be completed in November 2011. The project will be managed out of Aker Solutions' location in Stavanger.

Comments

Popular posts from this blog

What is Class I Division 2?

FUSE SIZING CONSIDERATIONS FOR HIGHER EFFICIENCY MOTORS

7/8 16UN Connectors that Provide 600 Volts and 15 Amps