Rotork Valve Actuators Utilised In LNG Project
Fluid power valve actuators from Rotork have been installed throughout a liquefied natural gas importing and distribution project that is expected to meet 40 per cent of the demand for gas in Chile. The liquefied natural gas (LNG) complex at Quintero Bay encompasses the installation of a sea terminal to receive LNG from tankers and a plant for regassifying and distribution by pipelines into central Chile. Rotork Fluid Systems has received orders for heavy duty, scotch-yoke pneumatic, gas-over-oil and high-pressure gas actuators, which have been supplied to valve-makers in France, Italy and Spain. The majority of the 87 CP and GP range pneumatic actuators supplied are operating cryogenic service ball and butterfly valves at the Quintero Bay marine terminal and the adjacent storage and regassification plant. The GO range of gas-over-oil and HPG range of high-pressure gas actuators have been supplied for a 28km pipeline that links the Quintero LNG complex to the Electrogas terminal at Qu...